Country: USA.
Class, [Type]: O. H. Perry, [FFG].
Homeport: Mayport.
Callsign: NTBK (
)
Builder: Bath Iron Works, Bath, Maine, USA.
Laid down date: 19 February 1982.
Launch date: 18 September 1982.
Commission date: 20 August 1983.
Decommission date: 22 March 2013.
Displacement ( tons ): 4000 full load.
Dimensions ( metres ): 138 x 14 x 6,5.
Main machinery: 2 x GE LM 2500 gas turbines ( 41000 hp ).
Speed ( knots ): 29.
Range ( miles ): 4500 at 20 knots.
Complement: 205 ( 15 officers ).
Guns: 1 x 1 76mm Mk75 OTO Melara, 1 x 6 20mm GE/GD Vulcan Phalanx Mk15 CIWS, 4 x 1 12,7mm.
Missiles: 1 x 1 GDC Mk13 mod4 launcher for: SSM: Harpoon and SAM: Standard SM-1MR.
Torpedoes: 2 x 3 324mm Mk32.
Radars: Air: AN/SPS-49; Surface: AN/SPS-55; Fire Control: STIR, WM-28.
Sonars: AN/SQS-56.
Helicopters: 2 x SH-60B Sea Hawk LAMPS III.
Class, [Type]: O. H. Perry, [FFG].
Homeport: Mayport.
Callsign: NTBK (




Builder: Bath Iron Works, Bath, Maine, USA.
Laid down date: 19 February 1982.
Launch date: 18 September 1982.
Commission date: 20 August 1983.
Decommission date: 22 March 2013.
Displacement ( tons ): 4000 full load.
Dimensions ( metres ): 138 x 14 x 6,5.
Main machinery: 2 x GE LM 2500 gas turbines ( 41000 hp ).
Speed ( knots ): 29.
Range ( miles ): 4500 at 20 knots.
Complement: 205 ( 15 officers ).
Guns: 1 x 1 76mm Mk75 OTO Melara, 1 x 6 20mm GE/GD Vulcan Phalanx Mk15 CIWS, 4 x 1 12,7mm.
Missiles: 1 x 1 GDC Mk13 mod4 launcher for: SSM: Harpoon and SAM: Standard SM-1MR.
Torpedoes: 2 x 3 324mm Mk32.
Radars: Air: AN/SPS-49; Surface: AN/SPS-55; Fire Control: STIR, WM-28.
Sonars: AN/SQS-56.
Helicopters: 2 x SH-60B Sea Hawk LAMPS III.
























